(Art. of Inst
OFFICE OF SURVEYOR GENERAL
ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR
Battery Road to Praya.
PLAN OR DESCRIPTION.
This service it is necessary now to commence in consequence of the private works in connection with the execution on Marine Lots No. 198 and 199 by the French Government, rendering the formation of the main channel or Nullah which passes between the Lots imperative as the Stream is of considerable magnitude and floods must be confined within proper limits to prevent the destruction of about 440 feet of the sea wall about to be reclaimed from the sea or the premises hereafter to be erected should the Stream undermine the rubble stone foundation wall and retaining wall bounding the Praya.
A plan of the site is attached, showing the works proposed to be executed by Government tinted, the Praya and work to pavement of coloured, the extension of the Praya in front of Orichterlony Battery may be postponed for some months and the amount necessary for it as well as works to the gas works brought forward.
Approved,
(Signed) M. J. Mercer
Acting Governor.
height 12 feet @ $10.50 per foot- 4,532.50 ashlar in rough alone and concrete @ 50 cents 262.50 sheet piling 15c. feet @ $1.50 2,500 Rough Stone filling 6420. 50 205Page 205
(Art. of Inst
OFFICE OF SURVEYOR GENERAL
ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR
Battery Road to Praya.
PLAN OR DESCRIPTION.
This service it is neces
recessary.
now to commence in consequen
of the private works in correc
of execution on
Marine Loto No 198
and 199 by the French Government, rendering the formation of
the main channel
or Nullah which passes between the
Lots imperative
as the Stream
in
DW
of considerable magnitude
floods must be confined within proper limits to prevent de 440 feet of the destruction of the Soto about to be reclaimed from the
Putaining wall.
sea or the premises hereafter to be erected should the Stranmilar dis Praya bounding the Wallo at average
undermine the rubble stone formidation wallo
lots and retaining
the filling.
A plaw of the site is attached, showing the works propend
to be executed by
Lloy
Trate and average
height 12 feet @ $10.50 per foot-
by Government tinted, the Prayer and work to pavement of coloured, the extersion of the I raya in lord of ditto, 5.0 vo
the Tenants mv-
|front of Orichterlony Battery may
ber
pretponed for as for lauperficial foot mouths and the amount necessary for it as well as works to the gas works brought forward
the
adjoining
on
Approved,
(Signed) M. J. Mereer
Acting
Governor.
for
of ashlar in rough
alone and concrete
AAV
@ 50 cento
to sheet piling
ay
15c. feet @ $1,50 Rough Stone filling
eforward
6420.
2,500.
262.50
50
4.532.50
205